This was a major reconstruction of a failed road which was achieved within programme and the clients budget, without the need to carry out lengthy and costly reconstruction.

Read More

case study
Type 2 A Class Road, Working at Night

Suffering from extensive edge failure, the original scheme required a 6 week closure of the carriageway to carry out the required excavation and re-instatement along this stretch.

Read More

case study
A1 - In Situ Foam Mix Recycling

Low Carbon Foam Mix Recycling benefits National Highways on the A1

Read More

case study
A1066 Brettenham, Norfolk

32000m2 reconstructed over 4 weekends mean low Carbon and less disruption for Norfolk

Read More

case study
Grid and Foam Trials Success on B1160 Wissington

Robust reconstruction with Geogrid to cater for HGV's keeps British Sugar PLC sweet in Wissington, Kings Lynn.

Read More

case study
A86 Newtonmore, Cairngorms National Park

In Situ Foam Mix for BEAR Scotland

Read More

Residential / Urban

case study
Residential Estate Road

In order to minimise the impact of construction traffic, the carriageway itself required structural enhancement and surfacing.

Read More

case study
Darlington - The Fairway & Harris Street

The Project involved creating a solution to an ongoing problem the client has been enduring over the past 5 years to a specific area of the network.

Read More

Rural

case study
Type 2 Road Haunch & Full Width

This scheme, identified by Shropshire Council was part of a larger programme of work to repair some of the county’s roads.

Read More

case study
Type 3 Rural Access Road - Forge Mill Lane

Extensive historic patch repairs were evident indicating structural issues in the carriageway which was breaking up allowing a degree of water ingress through surface cracking.

Read More

case study
Unclassified Roads

Fen Road as the name suggests is a rural single track built on soft, moving ground, resulting in cracking and deep rutting throughout.

Read More

case study
Type 2 HGV Route

This was a major reconstruction of a failed road which was achieved within programme and the clients budget, without the need to carry out lengthy and costly reconstruction.

Read More

case study
Type 2 Rural Link Road

The road was suffering from structural issues leading to extensive cracking and crazing on the surface.

Read More

case study
Type 2 A Class Road, Working at Night

Suffering from extensive edge failure, the original scheme required a 6 week closure of the carriageway to carry out the required excavation and re-instatement along this stretch.

Read More

case study
Unclassified Rural REGEN Road

The project involved the reconstruction of failing carriageways within Cambridge County Council’s rural network.

Read More

case study
Type 4 Rural Road

Showing signs of collapse and crackingwith particular issues at edges where larger vehicles appeared to have regularly overrun the extent of the existing structure.

Read More

case study
Type 4 Rural Road - Ashcott Somerset

This narrow rural road with a speed limit of 60mph had structural failures in the carriageway, some which had previously been patched.

Read More

case study
Cycle Route Improvement

The Marriott’s Way is England’s longest disused railway trail at 26 miles. Parts of the trail have been used for walking, cycling and horse riding since the 1970s.

Read More

case study
Type 3 Rural Access Road - Dadford Road

On initial visits surface issues indicated that structural failings were apparent and likely to be related to adjacent drainage and tree roots.

Read More

case study
Concrete Re-Structuring

The concrete had been overlaid historically with layers of asphalt which was worn and reflects deeper cracking and movement within the structure.

Read More

case study
SPL Rural Norfolk Recycling

A co-ordinated partnership between the Client team, SPL and Norfolk’s maintenance contractor Tarmac enabled a rapid investigation, mobilisation and delivery of approximately 96,000 m2 of structural in situ recycling.

Read More

case study
REGEN Sites for Cumbria

Various REGEN sites utilised for Tar encapsulation in Cumbria

Read More

case study
Cant's Drove Cambridgeshire

Cambridgeshire REGEN with Geogrid & Textile

Read More

case study
Berrick Salome, Foamed Bitumen In Situ

Foamed Bitumen Recycling for Rural Oxfordshire

Read More

Regen Roads / Haunch

case study
Unclassified Rural REGEN Road

The project involved the reconstruction of failing carriageways within Cambridge County Council’s rural network.

Read More

case study
Type 2 Road Haunch & Full Width

This scheme, identified by Shropshire Council was part of a larger programme of work to repair some of the county’s roads.

Read More

case study
SPL Norfolk Outwell Road

The section of Outwell Road identified for structural recycling runs between Middle Level Drain, part of the drainage network between the Rivers Nene and Great Ouse, and Highbridge Road in the Hamlet of West Head.