CASE STUDY

Scheme: Marriott’s Way, Norwich
In-Situ Process: 150mm HBM

Cyclists and pedestrians benefit from re-engineered section of Sustrans National Cycle Route No.1

Authority: Norfolk County Council
Client: Norfolk County Council
Date: June 2016
Area: 2075 m2
Surface: Emulsion seal & grit for non-vehicular traffic
CO2 Saving: 20 tonnes

The Marriott’s Way is England’s longest disused railway trail at 26 miles. Parts of the trail have been used for walking, cycling and horse riding since the 1970s.
The route is entirely in public ownership; with the majority of the route owned and managed by Norfolk County Council, alongside Norwich City Council and Broadland District Council.
Around 110,000 people walk, cycle or ride on the Marriott’s Way annually and it is part of Sustrans National Cycle Route No. 1 (Dover to Shetland). The whole length of the Marriott’s Way has been designated as a County Wildlife Site.

The surface needs to be appropriate for all users:

  • Cyclists
  • Walkers and runners
  • Horse riders

The Marriotts way project is to contribute to the objectives of the wider Transport for Norwich Programme which are to:

  • boost economic growth by enabling residents to reach job opportunities, city centre facilities and linking major development sites to the cycle network
  • provide cycling infrastructure at an early stage of new development to shape travel behaviour from the outset
  • tackle health problems in parts of the County with high levels of obesity by providing cycling infrastructure
  • Increase the level of commuter cycling within the Thorpe Marriott to Norwich City Geographical Area
  • broaden the demographic appeal of cycling
  • reduce the rate of accidents involving cyclists and pedestrians