CASE STUDY

Scheme: Link Road, Monmouth
In-Situ Process: Deep In-Situ Recycling

The Link Road, Monmouth project demonstrates how Deep In-Situ Recycling can deliver a highly sustainable and cost-effective pavement solution while significantly reducing the demand for virgin construction materials.

Client: Monmouth County Council
Date: September 2026
Area: 6,868m2
Surface: 100mm
CO2 Saving: 39% - 97 tonnes of carbon saving

2,951 tonnes recycled on site; 100% recycled content achieved; no regulating layer required; 6,868m2 treated.

PROJECT OVERVIEW:
The Link Road, Monmouth project demonstrates how Deep In-Situ Recycling can deliver a highly sustainable and cost-effective pavement solution while significantly reducing the demand for virgin construction materials.

THE CHALLENGE:
The existing pavement structure required substantial intervention to restore long-term structural integrity and ride quality. Traditional reconstruction would have involved excavation, removal of existing materials, importation of new aggregates and asphalt, and additional regulating layers to achieve finished levels.

THE SOLUTION:
A 250mm Deep In-Situ Recycling treatment was selected. The process recycled 2,951 tonnes of existing road materials directly on site and a 100mm asphalt surface course was applied to provide a durable running surface.

SUSTAINABILITY BENEFITS:
The Deep In-Situ Recycling solution enabled 2,951 tonnes of pavement material to be recycled on site, achieving 100% recycled content. By comparison, a traditional asphalt reconstruction would have achieved approximately 62% recycled content.

COMMERCIAL ADVANTAGES:
The recycling process eliminated the need for asphalt regulating layers. On a traditional resurfacing scheme covering 6,868m², a 10-15mm regulating layer would typically be required. Avoiding this layer reduced asphalt tonnage, material deliveries and construction costs.

PROJECT OUTCOMES:
2,951 tonnes recycled on site; 100% recycled content achieved; no regulating layer required; 6,868m² treated.

CONCLUSION:
The scheme delivered substantial environmental and commercial benefits by maximising material reuse and reducing construction impacts.

The recycling process eliminated the need for asphalt regulating layers. On a traditional resurfacing scheme covering 6,868m², a 10-15mm regulating layer would typically be required. Avoiding this layer reduced asphalt tonnage, material deliveries and construction costs.