CASE STUDY

Scheme: High Lane, Scrivlesby, Lincolnshire
In-Situ Process: In-situ Retread 125 with Emulsion

The High Lane project continues with this legacy by integrating modern sustainability practices into the county’s historic infrastructure.

Client: Lincolnshire County Council
Main Contractor: Balfour Beatty
Date: May 2025
Area: 5,962 m²
Surface: Recycled Materials
CO2 Saving: 98.4 Tonnes

Lincolnshire’s road network has roots in Roman and medieval infrastructure, originally developed to support trade, military movement, and agricultural expansion.

These roads have long served as vital arteries for economic development and regional connectivity. The High Lane project continues with this legacy by integrating modern sustainability practices into the county’s historic infrastructure.

TECHNICAL APPROACH: RETREAD 125 PROCESS
The Retread 125 is an in-situ carriageway maintenance technique designed for lightly trafficked roads.
The process involves:

  • Pulverisation of 75mm – 125mm of existing surfacing to create granulated material.
  • 75mm to 125mm as specified on a site-by-site basis, bearing in mind the findings of the site investigation.
    The depth of planing/milling is taken from the level 1m from the clean carriageway edge.
  • Reworking the granulated material with approved aggregate and binder to form a new bound surface layer.
  • Achieving a final reworked layer thickness of 125mm.
  • Double Surface dressing with 10mm and 6mm aggregate after compaction to provide a durable running surface.

The road exhibited surface deterioration but retained sufficient underlying strength to justify in-situ recycling rather than full reconstruction.

WHY RETREAD 125
Retread 125 was selected as the most appropriate treatment for High Lane due to its ability to deliver structural improvement, carbon savings, and cost efficiency within the constraints of a rural environment.
The road exhibited surface deterioration but retained sufficient underlying strength to justify in-situ recycling rather than full reconstruction.

Key benefits included:

  • Minimised disruption – rapid in-situ process with minimal haulage and site traffic.
  • Environmental advantages – the reuse of existing materials significantly cut CO2 emissions and waste.
  • Cost-effectiveness – avoided the need for new aggregate and asphalt, reducing both material and transport costs.
  • Durability – the 125mm recycled layer provided a strong, long-term structural solution suitable for local traffic loading.
  • Overall, Retread 125 offered the optimal balance between performance, sustainability, and value for money for the council’s rural network.

MATERIALS AND SUSTAINABILITY

  • Only clean, recycled materials such as planings and crushed concrete were used.
  • Where necessary, imported materials were evenly distributed using a paver before scarification.
  • Unsuitable existing materials were removed to ensure quality and performance.
  • This approach supports circular economy principles and reduces the environmental footprint of road maintenance.

ENVIRONMENTAL IMPACT

  • Using recycled materials in the Retread 125 process for the High Lane project  saved approximately 98.4 tonnes of CO2e compared to using virgin asphalt. This figure  is based on the following calculation:
  • Volume of material used:
    5,962 m² × 0.125 m = 745.25 m³
  • Mass of material:
    745.25 m³ × 2.4 tonnes/m³ = 1,788.6 tonnes
  • Virgin asphalt emissions:
    1,788.6 tonnes × 85 kg CO2e/tonne = 152.03 tonnes CO2e
  • Recycled asphalt emissions:
    1,788.6 tonnes × 30 kg CO2e/tonne = 53.66 tonnes CO2e
  • Estimated carbon saving:
    152.03 – 53.66 = 98.37 tonnes CO2e

CONCLUSION

The High Lane scheme exemplifies how modern engineering techniques can be harmonized with historical infrastructure to deliver sustainable, cost-effective road maintenance. Lincolnshire County Council and Balfour Beatty have demonstrated leadership in adopting environmentally responsible practices that preserve road functionality while reducing carbon impact.