CASE STUDY

Scheme: The UK’s Largest Calcined Clay Project; Low-Carbon Road Recycling - Stocking Drove & Garden Lane, Cambridgeshire
In-Situ Process: REGEN using Calcined Clay Binder HEVA-SOL

In alignment with its commitment to sustainable road maintenance, Cambridgeshire County Council and their Term Maintenance Contractor, M Group, commissioned Stabilised Pavements Ltd (SPL) to deliver an innovative In Situ Recycling solution.

Client: Cambridgeshire County Council and their Term Service Contractor M Group
Date: March 2025
Area: 17,859m2
Surface: Double Surface Dressing (10 & 6mm Stone)
CO2 Saving: 324 tonnes (82%)

This scheme marked a groundbreaking enhancement in sustainable road rehabilitation, incorporating H-EVA SOL, a calcined clay binder supplied by Cemblend UK and produced by Hoffman Green in Dunkirk. Used as a direct low-carbon alternative to cement, this project represents the largest use of H-EVA SOL in the UK’s in-situ recycling process to date.

Innovative Process and Engineering Excellence

The REGEN Recycling process was deployed across Stocking Drove and Garden Lane, reinforcing 17,859m² of road surface. The project methodology remained consistent with traditional in-situ recycling, maintaining a 2% binder application at a 150mm depth – except with a significant reduction in embodied carbon emissions.

Key steps in the process included:

  • Pulverisation & Material Re-engineering: SPL’s advanced equipment pulverised and reshaped the existing carriageway materials, eliminating the need for excavation and disposal.
  • H-EVA SOL Application: The innovative calcined clay binder was integrated via a controlled spreader and mixed into the road structure, ensuring equivalent durability to conventional CEM 2 blended cement but with a significantly lower carbon footprint.
  • Surface Dressing: A double dressing of 10mm and 6mm stone was applied as the scheme progressed, allowing road users to return to the network in the shortest possible time. With safety in mind, the dressing was applied using a phoenix chipper and a walking floor lorry instead of tippers due to low power cables.

Environmental & Commercial Benefits

Unmatched Carbon Savings

The embodied CO₂ of H-EVA SOL is just 272 kgCO₂e per tonne, compared to 604 kgCO₂e per tonne for CEM 2, achieving a remarkable reduction in carbon impact without compromising structural performance.

Across the 17,859m² site, SPL’s REGEN Recycling with H-EVA SOL achieved a total carbon footprint of just 71 tonnes CO₂e,
compared to an estimated 395 tonnes CO₂e for a traditional asphalt reconstruction. This equates to an 82% reduction,
saving 324 tonnes of CO₂ – equivalent to:

  • 1,440,000 miles of car travel emissions
  • £20,000 in carbon savings under the EU Emissions Trading System

This project exemplifies sustainable road maintenance at scale, setting a new benchmark for carbon reduction in UK highway infrastructure.

Cost & Time Efficiency

By recycling existing materials in situ, the need for quarrying, haulage, and waste disposal was virtually eliminated, reducing material costs and transport-related emissions. The one-pass recycling and dressing approach minimised site occupation, ensuring that road users, businesses, and farmers experienced minimal disruption.

Enhanced Road Performance & Longevity

The incorporation of H-EVA SOL in the road structure, coupled with precision re-engineering, has enhanced the resilience and durability of the newly shaped carriageway. This approach mitigates the impact of historical weak subgrades while ensuring the long-term stability of the pavement under heavy agricultural traffic.

Conclusion

By integrating pioneering low-carbon binders and cutting-edge in situ recycling techniques, SPL has successfully delivered a cost-effective, environmentally responsible, and structurally robust solution for Cambridgeshire’s rural road network.